loader image

Quick-SqueezeTM

An improved solution for severe to complete loss of returns. Quick-Squeeze™ incorporates our newest “Quick2Mix™“ technology during the manufacturing process. Quick-Squeeze™ has been specifically developed to mix on site more than twice as fast as our competitions squeeze products.

GENERAL INFORMATION

For over four (4) decades our team has supplied the oil & gas industry with Ven-Fyber 201™ and Delta-P™ the original premium seepage loss products designed specifically for problems related to highly permeable formations. The Enventives Fyber with a Y Technology is based on our knowledge and R&D from the original cellulose fiber patents to today. Those original patents are the basis for all modern-day fiber LCM products. Only products from Enventives utilize our process know-how and are manufactured by our chemical and mechanical degradation of selected plant cellulose. The extremely fine cellulose fibers are surface modified to produce a novel class of cellulose derivatives having different properties and different functions than most commercially available cellulose derivatives.

The Quick-Squeeze™ unique chemistry will produce a hardenable slurry designed to be squeezed into down-hole loss zones. The high fluid loss and high solids content properties of the slurry combined with the large particle size distribution of the bridging and sealing materials in Quick-Squeeze™ quickly form a solid plug allowing wellbore returns to be established and to remain throughout extended drilling operations. Quick- Squeeze™ may be utilized in Water-based, Oil-based and Synthetic-based fluid systems, pilot testing is recommended to ensure compatibility.

A typical 100 pumpable barrel application can be prepared on-site utilizing conventional rig mixing equipment in less than 2 hours. A soft squeeze should be held at 50-250 psi for 4-6 hours. Quick-Squeeze™ may cause contamination of the drilling fluid and when necessary can be cleaned up by means of conventional high alkaline treatments. Quick-Squeeze™ seals are capable of withstanding swab and surge pressures incurred during normal drilling and pipe tripping operations. No additional products are required. No special mixing equipment is required. Quick-Squeeze™ provides a quick, effective and economical response to severe loss circulation events.

Quick-Squeeze™ has the fastest mix times in the industry. Quick-Squeeze™ can cure complete loss of circulation. Quick-Squeeze™ replaces more costly cement squeezes. Quick-Squeeze™ will not harden in the drill string. Quick-Squeeze™ can be used in Water-based, Oil-based and Synthetic-based fluid applications. Quick-Squeeze™ can prevent sidetracking of the wellbore, Quick-Squeeze™ plug is drillable and will not cause sidetracking. Quick-Squeeze™ can be used with other LCM materials but no other LCM materials are required. Quick-Squeeze™ works with conventional rig mixing and pumping equipment. If needed, Quick-Squeeze™ can be cleaned up through economical alkaline treatments.

Quick-Squeeze™ can be used advantageously in conjunction with our other ‘Fyber with a Y’ products designed for seepage to severe fluid loses: Ven-Fyber™ (fine, medium, coarse), Delta-P™, Delta P-RO™ and Delta P Black™.

The Enventives ‘Fyber with a Y ‘products perform better requiring less product in your drilling fluid, allowing your drilling fluid to perform to its fullest potential. Our products have been developed to work in the field not to beat a lab test or look pretty during a sales pitch.

The proactive, preventative measures to mitigate Seepage Loses and Lost Circulation are often more effective than the reactive mitigation programs implemented after whole fluid losses have occurred.

GENERAL INFORMATION

For over four (4) decades our team has supplied the oil & gas industry with Ven-Fyber 201™ and Delta-P™ the original premium seepage loss products designed specifically for problems related to highly permeable formations. The Enventives Fyber with a Y Technology is based on our knowledge and R&D from the original cellulose fiber patents to today. Those original patents are the basis for all modern-day fiber LCM products. Only products from Enventives utilize our process know-how and are manufactured by our chemical and mechanical degradation of selected plant cellulose. The extremely fine cellulose fibers are surface modified to produce a novel class of cellulose derivatives having different properties and different functions than most commercially available cellulose derivatives.

The Quick-Squeeze™ unique chemistry will produce a hardenable slurry designed to be squeezed into down-hole loss zones. The high fluid loss and high solids content properties of the slurry combined with the large particle size distribution of the bridging and sealing materials in Quick-Squeeze™ quickly form a solid plug allowing wellbore returns to be established and to remain throughout extended drilling operations. Quick- Squeeze™ may be utilized in Water-based, Oil-based and Synthetic-based fluid systems, pilot testing is recommended to ensure compatibility.

A typical 100 pumpable barrel application can be prepared on-site utilizing conventional rig mixing equipment in less than 2 hours. A soft squeeze should be held at 50-250 psi for 4-6 hours. Quick-Squeeze™ may cause contamination of the drilling fluid and when necessary can be cleaned up by means of conventional high alkaline treatments. Quick-Squeeze™ seals are capable of withstanding swab and surge pressures incurred during normal drilling and pipe tripping operations. No additional products are required. No special mixing equipment is required. Quick-Squeeze™ provides a quick, effective and economical response to severe loss circulation events.

Quick-Squeeze™ has the fastest mix times in the industry. Quick-Squeeze™ can cure complete loss of circulation. Quick-Squeeze™ replaces more costly cement squeezes. Quick-Squeeze™ will not harden in the drill string. Quick-Squeeze™ can be used in Water-based, Oil-based and Synthetic-based fluid applications. Quick-Squeeze™ can prevent sidetracking of the wellbore, Quick-Squeeze™ plug is drillable and will not cause sidetracking. Quick-Squeeze™ can be used with other LCM materials but no other LCM materials are required. Quick-Squeeze™ works with conventional rig mixing and pumping equipment. If needed, Quick-Squeeze™ can be cleaned up through economical alkaline treatments.

Quick-Squeeze™ can be used advantageously in conjunction with our other ‘Fyber with a Y’ products designed for seepage to severe fluid loses: Ven-Fyber™ (fine, medium, coarse), Delta-P™, Delta P-RO™ and Delta P Black™.

The Enventives ‘Fyber with a Y ‘products perform better requiring less product in your drilling fluid, allowing your drilling fluid to perform to its fullest potential. Our products have been developed to work in the field not to beat a lab test or look pretty during a sales pitch.

The proactive, preventative measures to mitigate Seepage Loses and Lost Circulation are often more effective than the reactive mitigation programs implemented after whole fluid losses have occurred.

RECOMMENDATIONS

A 100 bbl slurry should be pumped at the thief zone. Fill the backside with water. Close the BOP’s and begin applying soft squeeze at 50 psi up to 250 psi and hold for 4-6 hours.

*High viscosity treatments may be necessary to treat the most severe lost circulation events

**Due to variations in base oils and synthetic base oils and the effects on barite, pilot testing is highly recommended to determine precise formulations. Slurries that become too thick should have up to 1.0 bbl of wetting agent added to aid in thinning the slurry.